Calculators

Visual fence planner

Visual fence planner: length, direction, gate start, gate width.

One layout. Every calculation.

Layout

Each segment starts at the previous endpoint. Gate start and width are distances between post centers; enter zero width for no gate. 0° points right and 90° points up. A closed loop must end at its starting point. The start coordinates apply only when New start is selected.

Budget

No automatic price assumptions. Enter current quotes in one currency.

Results

Connected corner or gate posts are counted once. Gate frame boards and hardware are separate. This is a materials estimate, not a structural design.

Saved projects stay on this device. Nothing is uploaded. Project is not saved until you press Save. Print settings: choose Save as PDF in your browser.

Inputs and assumptions

  • Length
  • Direction
  • Gate start
  • Gate width

Each segment starts at the previous endpoint. Gate start and width are distances between post centers; enter zero width for no gate. 0° points right and 90° points up. A closed loop must end at its starting point. The start coordinates apply only when New start is selected.

Formula

Σ L; Lf = Σ(L - G)

Measure the fence line, not the lawn

Start with a sketch that names every endpoint and corner. Confirm the legal boundary from your survey or a qualified surveyor. A visible hedge or an old fence does not prove the boundary. Mark buildings, access paths and areas that must remain reachable.

Record each straight run separately. Measure horizontally between proposed post centers. Write down the direction, slope and any obstruction. For a gate, record both its position along the run and its planned opening. Do not subtract the same gate from two runs.

For a 12 m run with a 1.2 m gate starting at 5 m, the fence occupies 5 m before the gate and 5.8 m after it. Enter all three dimensions in the planner. Before digging, use the utility-location process for your country and check permits, setbacks and local height rules.

This is a materials estimate, not a structural design. Gate frame boards and hardware are separate. Follow the product label. Yield and coverage are editable.

Related pages